Reser
Stadium
Hunt Construction Group/Wildish
Hunt Wildish could only work from the outside of the stadium,
because the playing surface had to be protected. This necessitated
the use of two tower cranes with off-set heights. The cranes
allowed crews to construct four towers that support the new
addition to be constructed concurrently.
Because of the wet Oregon climate, a strict quality control
program was instituted for waterproofing and moisture protection.
Project Team:
Owner: Oregon State University
Design Firm: HNTB
General Contractor: Hunt
Wildish
Return to list
|